Attention Contractors Preparing California Storm Water Construction General Permit Annual Reports.

New Help Guide Now Available

CICWQ wants to make you aware of a recent announcement by the State Water Resources Control Board that a new Help Guide is available to assist in preparation of Annual Reports submitted through the SMARTS system.

Please see the announcement below and use the included link to access the Help Guide: Hello, the State Water Board construction storm water staff have developed a Help Guide for the electronic Annual Report for the statewide storm water construction general permit. This Annual Report is required to be electronically certified and submitted using the Storm Water Multiple Application and Report Tracking System (SMARTS). The Annual Report is due September 1st of each reporting year.

The help guide is available here: http://www.swrcb.ca.gov/water_issues/programs/stormwater/docs/construction/cgp_annual_report.pdf

Site design by Chris Kennedy. Content copyright Construction Industry Air Quality Coalition.

Please review our privacy policy and terms of use.

Supported by the Southern California Industry Advancement Funds and other organizations throughout the state.